The Realisation of a dream |
31/07/2006 |
Elimbah Qld |
|
Most of the floor was water damaged so it was all replaced |
|
| | Current Average Rating:- Picture hasn't been rated
Your Rating:- |
|
|
After sitting near a tree for 4 years the roof was a bit dirty |
Current Average Rating:- Picture hasn't been rated
Your Rating:- | |
|
Floor replaced and the first of many floor plans laid out on the floor with masking tape. We used a lot of masking tape doing this |
|
| | Current Average Rating:- Picture hasn't been rated
Your Rating:- |
|
|
Next was to remove some windows from each side |
Current Average Rating:- Picture hasn't been rated
Your Rating:- | |
|
|